More Benefits Of Integrated Construction Software

Monday, November 22nd, 2010

In my last post I talked about how an integrated construction software system can automatically generate a job schedule from the data in the job estimate.

Now that you have a job schedule, and it is integrated with your job estimate data, there are a lot of very useful things you can get out of that, such as:

Allowance Schedule

Allowance items are items that your customer must shop for and select before they can be purchased and installed. Allowance items include things like floor covering, wall covering (wall paper, paint colors), ceramic tile, finish electrical and plumbing fixtures, cabinets, and appliances.

Allowance items are called “allowances” because their exact costs cannot be known until specific products have been selected. So, when the contractor writes the contract, an allowance amount is added to the contract for each allowance item. The customer is allowed to select any product priced up to the allowance amount, and must pay the difference between the allowance amount and the actual cost of the product selected.

An Allowance Schedule shows the list of allowance items, with the dates on which each item must be ordered in order to be received in time for scheduled installation.

How does the Allowance Schedule know when each item must be ordered?

When you create an estimate, you specify which items are allowances by checking a box to indicate an item is an allowance item. If the item has a product associated with it, the product information includes the order lead time – how much in advance the product must be ordered. Since the job schedule knows when the item is scheduled for installation, the allowance schedule calculates the “order by date” by subtracting the order lead time from the date of scheduled installation.

So, the allowance schedule gives your customer two very important pieces of information: how much they are allowed to spend for each item (or pay the difference), and when each item must be ordered to be received in time for scheduled installation. Giving your customer this information in a clear, concise form is good for both you and your customer. It gives your customer the information they need in order to keep up with the project schedule, and it gives you a very clear document to refer to when questions arise about the amount of their allowances, or why the job has fallen behind schedule (because the customer didn’t order the product on time).

While we’re on the subject of allowances, I should mention another very important feature of integrated construction project management and accounting systems. As we all know, construction clients rarely pick out allowance items for the exact price that you allowed in your contract, so obviously there is a need to account for the differences.

This means that records have to be kept of the allowance amount for each item, the actual cost for each allowance item, and a report must be provided to the customer to document the difference between the original contract amount and the actual amount after allowance items were purchased. Managing that manually is a pain and a lot of work, but a worthy integrated construction software system will do all of that for you automatically. How?

The system knows which items are allowances, so after you enter actual costs for them, it can automatically recalculate the contract amount, and generate an “allowance variance” report, which is a sort of automatic change order for allowance items that documents the difference between the allowance amount and actual cost for each item.

Draw Schedule

A Draw Schedule shows the dates on which draw (invoice) payments will be due, and the amount of each payment. The payments are based on the value of the job items anticipated to be completed within the draw payment period. A good integrated construction software management system can generate a draw schedule automatically. How?

Since the program knows the scheduled installation for each item, and it knows the estimated cost for each item, all you have to do is tell it the draw payment period (how often draws will be made – 15 days, or 30 days, etc.) and the program adds up all of items that are anticipated to be completed within each payment period.

Purchase Orders

Purchasing is an area in which an integrated construction project management system can be of tremendous benefit. Purchasing materials for a construction project is extremely tedious, time consuming, and error prone. And errors in ordering construction materials can wreak havoc on your job schedule.

Also, the difficulty in purchasing materials for construction projects results in a significant “hidden cost” that contractors just have to live with because there’s no way around it. What hidden cost? Let me explain…

If you need to purchase a single medium to big ticket item, you will logically shop around to see where you can get the best price. If you need to purchase a few items, you’ll still check around to compare prices and go with the supplier with the lower overall cost. But if you have to purchase hundreds of items for a job, and thousands of items for multiple jobs over a year, what are you going to do? Do you shop around for prices for every item you purchase? No. You do what all contractors do: decide on a materials supplier (based on whatever criteria that may be: the convenient location, or the because of the gal in the sales office) and stick with them.

Well, guess what: building materials suppliers know that you don’t have the time and resources to shop around for everything you purchase. So what does that mean? Let’s just say materials suppliers don’t feel any pressure to compete for your business based on pricing. This means that, at best, you may not be getting the best price for your purchases, and at worst, you may be getting gouged. But how would you know? And what could you do about it?

Well, you could start using an integrated construction management software system that allows you to store and compare product price lists for each of your vendors, and then automatically select the vendor with the lowest price when it generates purchase orders to purchase materials for a job.

How would you get all those product prices into the computer?

Other than typing them in manually, a good construction software management system will give you two ways to do that. One is that you should be able to automatically submit price quote requests to your vendors for specific items (with specific quantities needed) for a job, and you should be able to do that by email so that the vendor can do the data entry and email the prices back to you so you can import them.

Or, your vendor should be able to provide you with a computer file that contains their product price list, which you can simply import into your construction management system.

So, instead of sitting and staring at plans for hours on end to compile lists of materials to purchase, you can use an integrated construction project management system to generate purchase orders for you automatically. And if the construction system also integrates the job schedule data, then the purchase orders can be generated based on the dates on which the materials purchased need to be delivered in time for installation.

Work Orders

If you have employees, then you need to provide them with instructions for what work items they are assigned to at which job sites, and when. An integrated construction project management and scheduling system will allow you to assign employees (resources) to schedule items, and then automatically generate work orders to be distributed (by paper or email) to employees. Work orders can be re-generated as a result of last minute changes and updates to the job schedule.

Data Integration Caveat

Friday, November 12th, 2010

OK, I’m convinced! I definitely want to buy an “integrated” construction software system.

Well, not so fast.

Unfortunately, there is a fair amount of latitude taken among some construction software makers in how they define the term “integrated data”. Some software companies market their software as being “integrated”, when in fact it is only able to copy data from one part of the system to another. So the data still exists in separate instances for each functional part of the program. This is better than having to enter it into each program module from scratch, but not much better.

The problem with that approach is that, once you copy data from one module to another, you must make any updates to the data in all places where that same data exists. You can’t update the data in one module and then re-copy it to another module, because that will over-write the changes that you made to the data in the second module. So in systems like that, you are forever required to make updates to the same data in as many places as it exists.

That’s not data integration in our book.

The only truly integrated construction software systems are systems in which the data exists in a single central database, where all data is entered only once, where all information only exists in a single instance of itself (information is not duplicated anywhere in the system), and where changes to data entered in one part of the program are instantaneously reflected in all other parts of the program. That’s data integration.

So how do you tell if a software system is truly integrated or not?

One easy way to tell whether the data in a system is truly integrated is if the system is based on Microsoft Office (Excel spreadsheets, Word documents, Project schedules). If a software system is based on Microsoft Office, then the data is not integrated.

Software systems that are based on Microsoft Office (UDA ConstructionSuite, for example) are not integrated because the data can only exist in separate files (Word documents, Excel spreadsheets, Project files, etc.) You can copy data from one source to another, but, as described above, when you do, you are creating multiple instances of the same data. So when information about the job changes (as it does every day), you must update that information in every place that information exists in the system (and make sure you remember where it all is!). Also, when you make changes to information in one part of the program, since that data is separate from data in the rest of the system, those changes are not reflected in other parts of the system.

What about construction software that integrates with software made by other software companies, like QuickBooks? Is that really integrated?

Good question. There are many construction software companies who advertise that their system integrates with QuickBooks. But look out. QuickBooks integration is another issue that has multiple definitions. Many construction software systems advertise that they are integrated with QuickBooks when really they are only able to export data that can be imported into QuickBooks. Again, this is another example of duplicating data resulting in the problems that come from that: when information in your construction system changes, you will need to re-export it and re-import it into QuickBooks. Or you will need to manually make the same changes in QuickBooks that you did in your construction software system. That’s not real data integration.

But QuickBooks has it’s own database, so data has to exist in both systems, right?

Right. But QuickBooks provides other software developers with an “application programming interface” (API) which allows other software companies to write programs to automate the synchronization of data between two systems. So even though the data does physically exists in both systems, a program can be written to automatically and transparently maintain the synchronization of data between the two systems – in real time. That’s data integration.

So, if you are considering a construction software system that is advertised to integrate with QuickBooks, make sure you find out whether the synchronization of data between the two systems is managed automatically, in real time, or whether that has to be done manually, or in batch update mode.

Job Scheduling

Friday, November 12th, 2010

Benefits of Construction Software: Generating Construction Schedules

In my last post I talked about how an integrated construction software system can automatically generate customized documents for your customer with specific information about their job. Another thing an integrated construction software system should be able to do is generate a CPM job schedule. (more…)

Using Construction Software: Construction Documents

Wednesday, November 3rd, 2010

In my last post I talked about the benefits of using detailed job cost estimates, and then I started to talk about how using detailed job cost estimates (in an integrated construction software system) pays additional dividends.

An integrated construction software system is a system that shares all of its data between all of the systems functions. The advantages of using an integrated  system are:

  • You only enter each piece of information once.
  • Data entered in one part of the program can be used in other parts of the program.
  • The data entered in one part of the program can be validated for logical consistency for use in other parts of the program.
  • Because data is only entered once, there is no discrepancies between data in various parts of the system.
  • When data is changed in one part of the system, the changes are reflected in other parts of the system that may be affected.

Another benefit of using detailed job estimates in an integrated construction management system is that you can use the data in the estimate to generate a number of different types of documents for uses other than job estimating, such as:

  • create construction proposals, bids, and contracts
  • create construction schedules
  • request construction materials price quotes
  • request construction subcontract RFP’s or bids
  • create construction materials purchase orders
  • create subcontractor contracts
  • track construction costs
  • create construction invoices and AIA payment applications

Today, I’m going to talk about the first item, creating construction documents for your customers. This includes construction proposals (construction bids), construction contracts, and other construction documents that your customer needs in order to be kept informed about the construction process as it progresses.

“Keep my customer informed? Thanks but no thanks! I don’t want them breathing down my neck any more than they already do!”

Referring back to my Chicken And The Egg post, remember that your customers only fear what they don’t know. So, rather then leaving them in the dark, your relationship with your customer will actually be greatly improved if you give your customer clear and complete documentation about the job from end to end, on an ongoing basis.

And remember, you’re using integrated construction management software now, so this isn’t going to take any more work. Once you’ve created a detailed job estimate, you can just click some buttons and watch the program go to work for you…

The first thing your customer needs is a printed proposal that will clearly define the scope of the work you propose to do. There are a number of reasons both you and your customer need this, but the two main reasons are that a printed proposal gives you…

  • Something to refer to when questions arise about exactly what the customer requested and exactly what you agreed to do.
  • Something to refer to when questions arise about how much the customer agreed to pay for what you proposed.

So to create a printed job proposal, or contract, your worthy construction software system will take all of the information in your job estimate, and merge it into a “template document”, or “merge document” to produce a customized proposal or contract for your customer – complete with your company’s logo and letterhead.

A “template document”, or “merge document” is like a “mail merge” document in MS Word; it merges data from a data source (such as your job estimate, etc.) into standardized text, to generate a customized document for your customer, such as this: Fixed Sum Contract.pdf.

Merge documents allow you to develop and save standardized text that you can use over and over again to produce any number of different documents that your customers will need, or will greatly appreciate. A good construction software system will allow you to produce any of the following types of merged documents:

So, all of these documents can be produced by simply merging data that is already in your worthy construction software system into your pre-defined merge documents.

That’s pretty slick. But then what do you do with them? Print them out and hand them (or mail them) to your customers? Yes, you can do that, and a lot of folks still like paper these days. But a lot of your younger customers, being all into the internet and iPhone gizmos, might ask you to email your documents to them, or post them on the web so they can download them.

Well, your worthy construction software system should be able to do that too, without any fuss.

So see, here you have gone from simply having created a detailed job estimate to having all sorts of useful customized documents generated and printed, emailed, or posted on the internet for your customers, without doing any more work. Not so bad.

And along the way, besides having made your job estimating more accurate, you have also greatly improved your professional image!